摘要
为研究和分析广西钦州港研究总体规划方案实施后港池及航道泥沙淤积情况,在二维潮流、波浪数学模型研究成果及现场水文测验和底质分析的基础上,利用泥沙冲淤计算公式,采用正常天气及台风天气情况,对造成港池及航道淤积的悬移质和推移质量值分别进行计算和分析,可为后续工程建设中的泥边淤积研究工作提供参考。
To study and analysis the sedimentation in the dock and the channel of Qinzhou Harbor after the general plan project is carried out, based on the research result of the 2D tide numerical model and the wave numerical model, the field hydrological survey and the study on bed material analysis, using the sedimentation calculation formula, adopting the ordinary and the calamitous condition, the sedimentation is calculated and analyzed for suspend and bed load. Reference can be provided for the research of construction of sediment deposition for the follow - up project.
出处
《水道港口》
2008年第1期31-35,共5页
Journal of Waterway and Harbor
关键词
淤积
港池
航道
钦州港
sedimentation
dock
channel
Qinzhou harbor