基于成本-时间-质量的项目过程风险管理 被引量:2

Risk Management of Project Process Based on Cost-Time-Quality
下载PDF
导出
摘要 由于成本、时间、质量的相互约束关系,在项目生命周期的不同发展阶段,需要对三者的相对重要关系做出权衡,把模糊综合矩阵模型和层次分析模型相结合,来判定他们相对权重以及各风险因素可能发生的概率,及其对成本、时间和质量的不同影响。最后得出各风险因素的综合风险损失,进行排序及划分风险等级。从而可以对确立项目过程中的风险主题进行动态的过程风险的监控管理。 Because of the binding interaction of cost, time and quality, we need to weigh the relative interaction of the three factors in the different stage of the project life cycle. The AHP along with the knowledge of fuzzy math is introduced to balance the different weight vectors of cost, time and quality and to analyze the probability of different risks and their disparate effects on the three factors. By calculating the synthetic effects of each risk, the ranking of them is made and the level is clear by using ABC analysis method. Thus we can get the theme of risk management of different stage, and carry on dynamic supervision and control the risk of the project.
机构地区 西南石油大学
出处 《软科学》 CSSCI 2007年第3期50-54,共5页 Soft Science
基金 四川省学术和技术带头人培养资金资助项目(A200501)
关键词 项目过程风险管理 风险管理主题 模糊层次分析 project risk management theme of risk management fuzzy AHP
  • 相关文献

参考文献8

  • 1杨梅英.风险管理与保险管理[M].天航空大学出版社,1999.
  • 2朱大萌,马诗咏.项目风险管理的持续改进方法[J].建筑管理现代化,2004,18(4):11-14. 被引量:8
  • 3Noah American Project Management Institute. A Guide to the Project Management Body of Knowledge [ Z ]. 2000 Edition ( Guide to the Project Management Body of Knowledge) ,2000.
  • 4丘莞华.项目管理[M].科学出版社,2001.
  • 5王琦,席酉民,尚玉钒.和谐管理理论核心:和谐主题的诠释[J].管理评论,2003,15(9):24-30. 被引量:78
  • 6[美]TL萨蒂.层次分析法[M].许树柏等译.北京:煤矿工业出版社,1988.
  • 7Ali Jafi. Management of Risks, Uncertainties and Opportunities on Projects:Time for a Fundamental Shift [ J ]. International Journal of Project Management,2001 (19) :89 - 101.
  • 8李丽.工程项目全面风险管理的理论与方法研究[D].北京工业大学硕士学位论文.

二级参考文献4

共引文献84

同被引文献16

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部