HTR-10备用主氦风机更换方案设计 被引量:1

Replacement Scheme Design of Reserve Helium Circulator of 10 MW High Temperature Reactor
下载PDF
导出
摘要 采用备用磁轴承主氦风机替代目前使用的滚动轴承主氦风机是10 MW高温气冷堆(HTR-10)的重要技术革新。通过对两风机的比较及一回路舱室剂量场测量验证了操作可行性,提出了舱室内拆装和舱室外拆装两种更换方案,并使用三维数字模拟技术对两种方案进行了仿真。通过对安全性、工作难度、工作量等方面的综合评估,认为舱室外拆装方案可行性较强。 As one of the crucial innovations of 10MW high temperature reactor (HTR-10), the current helium circulator using rolling bearings will be replaced by the reserve one using electromagnetic bearings. The feasibility of construction was certified by comparison between the two helium circulators and radiac measurement of the primary circuit. The construction schemes of inside vessel and outside vessel were proposed and simulated by 3-D digital emulation. The scheme of inside vessel was considered to be more feasible by comprehensive evaluation such as safety, difficulty and work amount.
出处 《核动力工程》 EI CAS CSCD 北大核心 2008年第2期70-73,共4页 Nuclear Power Engineering
关键词 10 MW高温气冷堆 备用主氦风机 更换方案 10 MW high temperature gas cooling reactor, Reserve helium circulator, Replacementscheme
  • 相关文献

参考文献2

二级参考文献3

  • 1Logan E. Turbomachinery [M]. Marcel Dekker, New Yerk. 1993, 29 - 44.
  • 2Zhou H Z, Wang J. Helium Circulator Design and Testing [J]. Nuclear Engineering and Design, 2002, 218:189 - 198.
  • 3王捷,周惠忠,汤全法.HTR-10主氦风机性能试验研究[J].高技术通讯,2002,12(11):96-100. 被引量:8

共引文献9

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部