根据安全门方案确定的原则和方法,结合重庆轻轨2号线高架车站单轨的特点设置站台安全门,从安全门的高度、控制方式及门体广告进行多方案比选,在工程实施阶段不断完善设计,使建成后站台安全门达到预期的效果,保证运营安全。
According to the principles and methods for determining the option of automatic platform gate (APG) and considering the features of monorail in elevated stations on Chongqing light rail Line 2, the design of automatic platform gates was carried out and improved during the manufacture and installation stage with the heights of gate, control modes and door advertisements compared and selected. In consequence, the desired results of APG will be achieved, and the operation safety will be secured.