出处
《都市快轨交通》
2008年第2期94-94,共1页
Urban Rapid Rail Transit
同被引文献11
-
1Greg,Gormick,高红斌(译).美国轻轨的繁荣[J].世界轨道交通,2006(6):58-59. 被引量:1
-
2IstanbulMetro[ EB/OL]. ( 2009 - 01 - 05 )[2009 -0628].http ://www. rideuta.com//Istanbul_Metro.
-
3Istanbul Metro[ EB/OL]. ( 2008 - 06 - 12 ) [ 2009 - 06 - 28 ] http ://en. wikipedia. org/wiki/Istanbul_Metro.
-
4Istanb Metro[ EB/OL]. (2007 - 04 - 19) [2009 - 06 - 29] http ://utahrails. net/uta/uta - trax. php/Istanbul_Metro.
-
5Istanbul Metro [ EB/OL ]. ( 2007 - 09 - 02 ) [ 2009 - 01 - 29 ] http://www.mobility.siemens, com/usa/en/pub/products/ infrastructure.htm/Istanbul_Metro.
-
6Istanbul Metro[ EB/OL]. ( 2006 - 11 - 01 ) [ 2009 - 01 - 30 ] http ://www. lightrail.net//Istanbul_Metro.
-
7Utah Transit Authority. Environmental Assessment for the Jordan River Service Center Light Rail Vehicle Maintenance & Storage Facility, 2009.
-
8Naser J. Airport to Downtown Light Rail Project [ R ]. Salt Lake City Public Open House,2007.
-
9Utah Transit Authority. Draper transit corridor alternatives analysis report[ R]. 2009.
-
10张荣忠.美国波特兰轻轨交通[J].都市快轨交通,2008,21(2):95-95. 被引量:1
-
1康明斯发布满足EPA2010年排放标准的中重型柴油机[J].重型汽车,2009(2):46-46.
-
2朱亚磊,吴南松.“小石城”号导弹巡洋舰 CL—92/CLG—4/CG—4[J].现代舰船,2006,0(10A):51-53.
-
3尹莉,易宇舵.浅谈路面设计中的几个方面[J].江西公路科技,2007,0(4):22-23.
-
4胡仕良.石城公交车供暖率达94%[J].城市公共交通,2004(1):43-43.
-
5赵新华,丁伟.运行速度评价技术首次在石城至吉安高速公路中的应用[J].江西公路科技,2010,0(2):70-72.
-
6RFID对减少沃尔玛断货的作用超出预期[J].A&S(安全&自动化),2006(6):34-34.
-
7美国百年危桥爆破后屹立不倒[J].中国公路,2016,0(21):24-24.
-
8Frank.康明斯发布满足EPA2010年排放标准的全系列中重型车用柴油机[J].交通世界,2009(10):112-112.
-
9国外发动机新技术[J].重发科技,2009(2):41-44.
-
10杨方.康明斯发布满足EPA 2010年排放标准的全系列中重型车用柴油机[J].商用汽车,2009(5):25-25.
;