期刊文献+

A probe into“mining technique in the condition of floor failure”for coal seam above longwall goafs 被引量:4

A probe into"mining technique in the condition of floor failure"for coal seam above longwall goafs
下载PDF
导出
摘要 Targeting at the coal seam with useful value discarded above goafs,attempted to explore the feasibility of'mining technique in the condition of floor failure' from theoretical point of view,and predicted.It indicated that mining technique in the condition of floor failure used above Longwall Goafs in Baijiazhuang Mining is totally feasible.At law,the deformation of the floor in the mining technique by means of probability-integral method.And it is discov- ered that deformed basin can emerge in the footwall of No.6 coal seam and its maximum subsidence was possibly 1 633 mm or so and its maximum positive curvature is 61.74/10^(-3). At last,it therefore suggests appropriate ground pressure control measures as strengthening observation of ground pressure and adopting false slope for exploitation and strengthening support for reasonable push and slide based on the adverse ground pressure behaviors possibly occurring in the mining technique.This serves to gather data and lay sturdy founda- tion for further probe into the mining technique,and offers theoretical and technical grounds for concrete implementation of the mining technique. Targeting at the coal seam with useful value discarded above goafs, attempted to explore the feasibility of “mining technique in the condition of floor failure” from theoretical point of view, and predicted. It indicated that mining technique in the condition of floor failure used above Longwall Goafs in Baijiazhuang Mining is totally feasible. At law, the deformation of the floor in the mining technique by means of probability-integral method. And it is discovered that deformed basin can emerge in the footwall of No.6 coal seam and its maximum subsidence was possibly 1 633 mm or so and its maximum positive curvature is 61.74/10-3. At last, it therefore suggests appropriate ground pressure control measures as strengthening observation of ground pressure and adopting false slope for exploitation and strengthening support for reasonable push and slide based on the adverse ground pressure behaviors possibly occurring in the mining technique. This serves to gather data and lay sturdy foundation for further probe into the mining technique, and offers theoretical and technical grounds for concrete implementation of the mining technique.
出处 《Journal of Coal Science & Engineering(China)》 2008年第1期19-23,共5页 煤炭学报(英文版)
基金 National Nature Science Foundation of China(50704024) Shanxi Youth Sci-Tech Research Foundation(2007021024) Taiyuan Innovation Program(special item for undergraduate innovation and starting business)(07010746)
关键词 mining technique in the condition of floor failure Iongwall goafs probability-integral method 废矿 长壁开采法 煤矿 开采技术
  • 相关文献

参考文献2

  • 1Khakimzhanov, T. E,Bimagambetov, M A,Azubaev, K. I.Influence of stability of direct roof on safety of operations[].Kompleksnoe Is-pol'zovanie Mineral'nogo Syr'ia.1996
  • 2Sizer E,Gill M.Pillar failure in shallow coal mines-a recent case history[].Transactions of the Institution of Mining and metallurgy.2000

同被引文献31

  • 1侯志鹰,王家臣.大同矿区“三硬”条件地表沉陷数值模拟[J].煤炭学报,2007,32(3):235-238. 被引量:10
  • 2伍永平.“顶板-支护-底板”系统动态稳定性控制模式[J].煤炭学报,2007,32(4):341-346. 被引量:44
  • 3Britton S G. Mining multiple seams [J]. Coal Mining & Processing, 1980, 17 (12) : 64-66.
  • 4Su W H, Peng S S, Hsiung S M. Interactions in multiple-seam mining [J]. Soc. of Mining Engineers, 1986:31 -44.
  • 5Dunham R K, Stace R L. Interaction problems in multiseam mining [ A]. 19th US Symposium on Rock Mechanics [ C]. Stateline, Nevada, 1978:174 - 179.
  • 6Kripakov N P, Beckett L A, Donato D A. Loading on underground mining structures influenced by multiple seam interaction [R]. Soc. of Mining Engineers of AIME, 1986:225 -236.
  • 7Khare S, Rao Y V, Murthy C S N, et al. Multiple seam mining: a critical review journal of mines [J]. Metals and Fuels, 2006, 54 (12): 327-329.
  • 8山西焦煤西山煤电集团公司,太原理工大学.白家庄矿6号煤层蹬空综采技术研究报告[R].太原:太原理工大学,2006.
  • 9Britton S G. Mining multiple seams [J]. Coal Mining & Processing, 1980, 17 (12) : 64 -66.
  • 10Su W H, Peng S S, Hsiung S M. Interactions in multiple-seam mining [R]. Soe. of Mining Engineers, 1986:31 -44.

引证文献4

二级引证文献145

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部