Numerical modeling for further understanding of roadway junction stability behaviour at deep underground

Numerical modeling for further understanding of roadway junction stability behaviour at deep underground
下载PDF
导出
摘要 The review and numerical analysis had been conducted further understand the deformation and failure beahviour of roadway junctions,associated with the different geometrical characteristics,various depth of cover,different mechanical properties around the junction and different construction sequences as well as different construction ad- vances during the roadway junction construction.The results confirme that the simple un- derground structure is more stable than complicated structures,and comparing with dif- ferent geometrical shapes of the two-dimensional roadway junctions,the most unstable one is the four way cross junction,which is the most commonly used in coal mines.On the other hand,the stability of the junction is not linearly related to the depth of cover,the sig- nificant effect only occurred when the depth of cover reached to 1 000 m.Also,with grad- ual degradation of rock mass,the deformation and failure around the junction increased significantly and nonlinearly.The modeling also conductes on the construction sequence for the junction,it is suggested that,during the junction construction,all the additional roadway should be constructed with the direction of moving away from,rather than for- ward to the junction.Finally,the construction advance is also considered for the junction development.It is suggested that when the construction is carried out around the junction, a small excavation advance,such as 1 m or 2 m is adopted for keeping small interruption on the existed roadway or junction. The review and numerical analysis had been conducted further understand the deformation and failure beahviour of roadway junctions, associated with the different geometrical characteristics, various depth of cover, different mechanical properties around the junction and different construction sequences as well as different construction ad- vances during the roadway junction construction. The results confirme that the simple un- derground structure is more stable than complicated structures, and comparing with different geometrical shapes of the two-dimensional roadway junctions, the most unstable one is the four way cross junction, which is the most commonly used in coal mines. On the other hand, the stability of the junction is not linearly related to the depth of cover, the significant effect only occurred when the depth of cover reached to 1 000 m. Also, with grad- ual degradation of rock mass, the deformation and failure around the junction increased significantly and nonlinearly. The modeling also conductes on the construction sequence for the junction, it is suggested that, during the junction construction, all the additional roadway should be constructed with the direction of moving away from, rather than forward to the junction. Finally, the construction advance is also considered for the junction development. It is suggested that when the construction is carried out around the junction, a small excavation advance, such as 1 m or 2 m is adopted for keeping small interruption on the existed roadway or junction.
出处 《Journal of Coal Science & Engineering(China)》 2008年第1期38-43,共6页 煤炭学报(英文版)
关键词 数字模拟技术 路面 稳定性 矿藏 开采技术 roadway junction strata control rock mechanics numerical analysis
  • 相关文献

参考文献10

  • 1王明洋,周泽平,钱七虎.深部岩体的构造和变形与破坏问题[J].岩石力学与工程学报,2006,25(3):448-455. 被引量:143
  • 2朱玉生,曹守虎.巷道交岔点顶板松动圈及加强支护范围的研究[J].建井技术,2005,26(2):28-32. 被引量:6
  • 3王培良.深部回采巷道交岔点支护形式探讨[J].煤矿开采,2001,6(4):57-59. 被引量:2
  • 4景海河,孙庆国,李希勇,胡兆峰,武雄.深部高应力软岩巷道支护问题及对策[J].煤炭技术,2001,20(3):34-35. 被引量:26
  • 5Singh R N,,Porter I,Hematian J.Finite element analysis of three-way roadway junctions in longwall mining[].International Journal of Coal Geology.2001
  • 6Hanna K,Conover D,Haramy K.Coal-mine-entry intersection behavior study[].USBureau of MinesReport of Investigations.1991
  • 7Balachandra M B.The three-dimensional structural analysis of double-entry and single-entry coal mines.Volum Ⅰ:three-dimensional finite elernent analysis of crosscut and entry intersection of a double-entry coal mine[]..1976
  • 8Peng S S.Roof bolting patterns at three-way entry intersections[]..1978
  • 9Filmer A O.Journal of The South African Znstite of Mining and Metallurgy[]..1982
  • 10R.G.Gurtunca,L,Keynote.Mining below3000 m andchallenges for the South African gold mining industry[].Proceedings of Mechanics of Jointed and Frac-tured Rock.1998

二级参考文献21

  • 1陈士林,钱七虎,王明洋.深部坑道围岩的变形与承载能力问题[J].岩石力学与工程学报,2005,24(13):2203-2211. 被引量:30
  • 2王明洋,戚承志,钱七虎.深部岩体块系介质变形与运动特性研究[J].岩石力学与工程学报,2005,24(16):2825-2830. 被引量:60
  • 3王明洋,邓宏见,钱七虎.岩石中侵彻与爆炸作用的近区问题研究[J].岩石力学与工程学报,2005,24(16):2859-2863. 被引量:46
  • 4陈宗基.地下巷道长期稳定性的力学问题[J].岩石力学与工程学报,1982,1(1):1-19.
  • 5董方庭.松动圈软岩锚喷支护理论和技术,中国煤矿软岩巷道支护理论与实践[M].徐州:中国矿业大学出版社,1996.50.
  • 6Adushkin V V,SpivakA A.Geomechanics of Large-scale Explosions[M].Moscow:Nedra,1993.
  • 7Kurlenya M V,Adushkin V V,Oparin V N.Alternating reaction of rocks to dynamic action,Doklady AN SSSR[J].Geotectonics,1992,26(2):323-329.
  • 8Kurlenya M V,Oparin V N.Problems of nonlinear geomechanics,part Ⅱ[J].Fiz.Tekh.Probl.Razrab.Polezn.Iskop.,2000,4:305-326.
  • 9钱七虎.深部地下空间开发中的关键科学问题[R].南京:解放军理工大学工程兵工程学院,2004.
  • 10Sadovskii M A.Natural lumpiness of rock[J].Dokl.Akad.Nauk SSR,1979,247(4):829-832.