摘要 根据大规模及多项目的特点,对大规模定制企业多项目进行了界定;在分析大规模定制企业多项目的概念、过程模型及特点的基础上提出进行多项目进度控制的必要性,同时,通过分析大规模定制企业多项目进度的制约因素提出大规模定制企业多项目进度进行控制的主要措施,并通过在省内一家企业实施,验证了措施的有效性。 The paper defined the multi-project in mass customization (MC) enterprise according to the features of customization and multi-project. Based on the analysis of multi-project conception, process model and its features in MC enterprise, we presented the necessity of multi-project scheduling control. Meanwhile, based on the analysis of restrictive factors in multi-project scheduling control, the paper presented major measures to realized control and proved their effectivity through applying the measures to an enterprise in Hunan province.
出处 《湖南大学学报(社会科学版)》 CSSCI 2008年第2期50-53,共4页 Journal of Hunan University(Social Sciences)
基金 国家自然科学基金项目(70671037) 高等学校博士学科点专项科研基金项目(20050532005)
关键词 大规模定制 多项目 进度制约因素 进度控制 Mass Customization multi-project schedule restrictive factor scheduling control
  • 相关文献

参考文献6

二级参考文献41

  • 1孙晓峰.模块生产网络研究[J].中国工业经济,2005(9):60-66. 被引量:24
  • 2[2]SILVEIRA Da G,BORENSTEIN D,FOGLIATTO F. Mass customization:literature review and research directions[J].International Journal of Production Economics, 2001,(6):1-13.
  • 3[3]GILMORE J H,PINE Ⅱ B.The four faces of mass customization[J].Harvard Business Review,1997,(1-2):91-101.
  • 4[4]HART C.Mass customization:conceptual underpinnings, opportunities and limits[J].International Journal of Service Industry Management,1995,(2):36-45.
  • 5[5]KAY M.Making mass customization happen:lessons for implementation[J].Planning Review, 1993,(4):14-18.
  • 6[6]KOTHA S. Mass customization:implementing the emerging paradigm for competitive advantage[J].Strategic Management Journal, 1995,(special edition):21-42.
  • 7[7]ROSS A.Mass customization-selling uniqueness[J].Manufacturing Engineer,1996,(6):260-263.
  • 8[14]LAMPEL J,MINTZBERG H.Customizing customization[J].Sloan Management Review,1996,(Fall):21-30.
  • 9[15]ALFORD D, SACKETT P, NELDER G. Mass customisation-an automotive perspective[J]. International Journal of Production Economics, 2000,(1):99-110.
  • 10[19]LAU R.Mass customization:the next industrial revolution[J].Industrial Management,1995, (5):18-19.

共引文献110

同被引文献17

  • 1赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12. 被引量:32
  • 2刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 3徐志勇,张开富,李正兰,姜寿山.一种面向航空产品的分级网络计划方法[J].计算机集成制造系统,2006,12(5):727-730. 被引量:6
  • 4Pellegrinelli Sergio, Partington David, Hemingway Chris, et al. The importance of context in programme management: An empirical review of programme practices [ J ]. International Journal of Project Management, 2007, 25 (1): 41-55.
  • 5Shehu Zayyana, Akintoye Akintola. Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis [ J]. International Journal of Project Management, 2010, 28 (1): 26-39.
  • 6Singer James E. Engineering program management [ J 1. Engineering Management Journal, 2009, 21 (3): 38-39.
  • 7Gaydar Michael. System Engineering and program management [ C ] //AHS International 64th Annual Forum Proceedings. Alexandria: AHS International, 2008: 1640-1644.
  • 8Jagathipriya, R P Byali, M V Kannan. Critical chain project management -A new project management philosophy for multi project environment [ J]. Journal of Spacecraft Technology, 2008, 18 (1): 30-36.
  • 9Goldratt E M. Critical Chain[ M]. New York: The North River Press,1997.
  • 10Rabbani M, Fatemi G S M T. A new heuristic for resource-constrained project scheduling in stochastic networks using criti- cal chain concept [ J]. European Journal of operational Research, 2007 (2) : 794 - 808.

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部