1Al-Bahar,J.F."Systematic risk management approach for construction projects"[].Journal of Construction Engineering and anagement.1990
2Boardman A,Greenberg D.Cost-Benefit Analysis:Concepts and Practice[]..1996
3Chen A.,K Subprasom,and Z.-W.Ji."Mean-variance model for the build-operate-transfer scheme under demand uncer- tainty"[].Transportation Research.2003
4Nash C,Samson T."Calculating transport congestion and scarcity costs"[].Final Report of the Expert Advisors to the High Level Group on Infrastructure Charging.1999