结合上海外高桥第二发电有限责任公司900 MW机组失去仪用气事故,对机组失气后的异常工况进行分析,并从运行和检修的角度提出了相应的对策。
Based on the instrument-used-gas absence accident occurred in the 900 MW unit of Shanghai Waigaoqiao No. 2 Power Generation Co. , Ltd. , the abnormal condition of the unit during the accident is analyzed. Countermeasures are proposed in the aspects of operation and maintenance.
出处
《华东电力》
北大核心
2008年第3期101-102,共2页
East China Electric Power
关键词
900MW
仪用气
气控阀门
汽机跳闸
900 MW
instrument-used-gas
gas-controlled valve
steam turbine trip