摘要
结合西汉高速公路工程,就20 m箱梁的底座、钢筋制安、模板安装、混凝土浇筑、张拉等工序的施工作了详细的介绍,在某些环节上改进了施工工艺,提高了工程质量,取得了很好的经济效果,以推广该施工工艺的应用。
Combined with the freeway project of Xi-Han, it introduces the construction of the bed, steel reinforced setting, model setting, concrete pouring, and tension of 20 m boxing beam, improves the construction technology of some links, increases the project quality, and it gets the good economical effects, to prompt the application of the construction technology.
出处
《山西建筑》
2008年第12期165-166,共2页
Shanxi Architecture
关键词
高速公路
预应力箱梁
后张法
施工技术
freeway, pre-stressing boxing beam, post-tensioning method, construction technique