摘要
结合新建精伊霍铁路科克乔克三号隧道工程实例,对隧道内施工机械的功率及输电线路电压降的计算进行了探讨,介绍了该隧道的高压进洞技术、高压进洞线路的设计与施工,具有一定的参考价值。
Combined with the practices of No. 3 tunnel engineeirng Kekeqiaoke of Jingyihuo railway built recently, The paper discusses respec- tively the power of constructing machine and calculation of lowening the electricity wire ' s electric perssure. Meanwhile, the high pressure accrossing hole technique in this tunnel is also introduced. The design and construction to high pressure accrossing hole circuit have some value for reference in the future.
出处
《山西建筑》
2008年第12期318-319,共2页
Shanxi Architecture
关键词
高压进洞
变压器
电压
隧道
high pressure accrossing holes, transformer, electricity pressure, tunnel