摘要 针对大港油田大位移井存在的摩阻和扭矩大、轨迹控制难度大、井壁稳定难度大、长裸眼段下套管难度大、井眼净化要求高等技术难点,研究制定了一套大位移水平井钻、完井技术。论述了大位移水平井实施中的井眼轨迹设计技术、导向钻井技术、漂浮下套管技术、高润滑强抑制的优质钻井液技术、摩阻扭矩预测及监测技术等,已钻成的3口大位移水平井的水平位移与垂深比大于2,其中庄海8Ng-H1井的水垂比为2.74,水平段732 m。实践证明,该套技术在大港油田是完全可行的。 In drilling the ERD wells,in Dagang Oilfield,many difficulties are confronted,such as the high drag and torque,difficult well trajectory control and well wall stability,running casing at long openhole section,high requirement of well cleaning,and so on.In response to this situation,a series of technologies for drilling ERD wells are researched and established.In this paper,the technologies used in the ERD wells drilling operation,including well trajectory control,steering drilling,running casing with floatation collar,high inhibitory & lubricative drilling fluid,drag and torque forecasting and monitoring are discussed.Among the 3 ERD wells drilled,the ratio of horizontal displacement to TVD of each well is greater than 2,the ratio of horizontal displacement to TVD of zhuanghai 8Ng-H1 well is 2.74,and horizontal section is 732m in lenth.The practice shows that all the technologies used in ERD well drilling operation are feasible.
出处 《西南石油大学学报(自然科学版)》 CAS CSCD 北大核心 2008年第2期104-108,共5页 Journal of Southwest Petroleum University(Science & Technology Edition)
关键词 大位移井 轨迹控制 摩阻扭矩 漂浮下套管 大港油田 ERD well trajectory control drag & torque running casing with floatation collar Dagang Oilfield
  • 相关文献

参考文献11

二级参考文献21

  • 1黄荣樽,邓金根.石油工程岩石力学研究进展[J].石油大学学报(自然科学版),1993,17(A00):50-60. 被引量:6
  • 2陈勉 陈治喜 等.大斜度油井的壁坍塌与破裂.中国岩石力学与工程学会第三次大会论文集[M].北京:中国科学技术出版社,1994.425-429.
  • 3[1]Analysis of buoyancy-Assisted casing and liner in mega- Reach wells[C].IADC/SPE 23878.
  • 4[2]Rebositioned running method for well tubulars[P].US patent 5,275 ,242.
  • 5[3]Tubing string design for a 35000ft ER wells[P].OTC 6038.
  • 6[4]Well productivity improvement using extreme over balance perforati ng and surging-case history[C].SPE 30527.
  • 7[5]Drilling and Cementing extended-reach bore holes[P].US patent 5, 343,950.
  • 8[6]New tool improves ability to run casing in long sections of higha ngle bore holes[C].IADC/SPE 21920.
  • 9[1]Mondshine, T C. Drilling-Mud Lubricity:Guide to Reduced Torque and Drag. OGJ, December 7.1970
  • 10[2]David A,Krol. An Evaluation of Drilling Fluid Lubricants to Minimize Differential Pressure Sticking of Drill Pipe. The Drilling Technology Conference Paper of the International Association Drilling Contractors, 1984