摘要
通过对乌江流域梯级水电站远程集控中心计算机监控系统与大屏幕投影系统数字信号通信网络实现方式的探讨,就乌江集控中心服务器端和客户端虚拟网络计算(VNC)软件的选择、安装和测试等方面,介绍乌江集控中心监控系统VNC实现的全过程。
The communication mode is discussed of the computer supervisory and control system and large-scale projection system of the remote centralized-control center of the Wujiang cascade hydropower stations. The realization of the virtual network computing (VNC) of the Wujiang computer supervisory and control system is introduced, including the selection, installation and debugging of the VNC server software and VNC client software.