主要针对三河发电厂脱硫系统的一些设计细节问题进行了探讨,并提出了相应的优化措施,以期进一步提高三河发电厂脱硫系统的运行稳定性。
This paper mainly discusses the design details of desulphurization system in Sanhe Power Plant, based on the discussion, corresponding optimization measures are proposed in order to improve the operation stability of desulphurization system in the power plant.
出处
《华北电力技术》
CAS
2008年第4期28-31,共4页
North China Electric Power
关键词
烟气脱硫
稳定运行
设计优化
技术探讨
flue gas desulphurization
stable operation
design optimization
technical research