某台200MW机组主汽阀入口管道接口错位分析与处理

ANALYSIS AND DISPOSAL OF JOINT INTERFACE MISPLACEMENT OCCURRED ON INLET PIPE OF MAIN STEAM VALVE FOR ONE 200 MW UNIT
下载PDF
导出
摘要 针对某电厂200MW供热机组主蒸汽管道与主汽阀发生的接口错位问题,分析了其产生的原因及其对主汽阀端口推力的影响,提出了通过支吊架载荷重新配置来减小主蒸汽管道对主汽阀垂直方向推力的处理措施,并对措施的安全性进行了评价。处理措施实施后,管道系统对主汽阀的端口推力达到了设计要求。 Directing againt the problem of joint interface misplacement occurred between the main steam pipeline and the main steam valve of a 220 MW heat- supplying unit in one power plant, the causes resulting in misplacement and its influence upon thrust on the port of said main steam valve have been analysed,and disposal measure,i, e. decreasing the thrust of main steam pipeline in vertical direction onto the port of main steam valve through the load redisposition of supports and hangers, has been put forward,and the safety of said measure being evaluated. After implementation of the measure,the thrust of pipe - line system excerted onto the port of main steam valve has reached the requirement of design.
出处 《热力发电》 CAS 北大核心 2008年第4期59-62,共4页 Thermal Power Generation
关键词 200 MW机组 主蒸汽管道 主汽阀 推力 管道接口 错位 200 MW unit main steam pipeline main steam vavle thrust joint interface of pipeline misplacement
  • 相关文献

参考文献5

  • 1DL/T5366-2006,火力发电厂汽水管道应力计算技术规程[M].北京:中华人民共和国国家发展与改革委员会,2006.
  • 2DL/T5054-1996,火力发电厂汽水管道设计技术规定[M].北京:中华人民共和国电力工业部,1996.
  • 3王致详.管道应力分析与计算[M].北京:水利电力出版社,1983.
  • 4安付立.主汽门对口错位分析与处理技术报告[R].TPRI/T4-RB-036-2006,西安:西安热工研究院有限公司,2006.
  • 5唐永进.压力管道应力分析[M].北京:中国石化出版社,2005.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部