期刊文献+

温米油田套管损坏原因分析及预防措施 被引量:7

Cause analysis and preventive measures of casing failure in Wenmi Oilfield
下载PDF
导出
摘要 温米油田经过十几年的开发,二次采油及井下作业等各种因素的相互影响造成油田套管损坏井逐年增加。根据历年套管损坏井统计分析表明,随着油田注水压力、地层压力的提高,套管损坏井越来越多。从套管损坏发生的区块、时间、井型、套管损坏变形性质及井下作业的影响等5方面进行了调查。经研究分析认为,温米油田的套管损坏主要原因是射孔、酸化压裂等井下作业以及注水开发和存在断层;次要原因是腐蚀、注气、钢材质量等。提出了预防套管损坏的措施,可为油田的套管损坏治理提供参考。 Through decades of development, the number of casing failure wells in Wenmi Oilfield has increased year by year, due to the interaction of various factors. According to the statistics of the casing failure wells over the years, the number of casing failure wells increases, as the water injection pressure and the formation pressure increase. In this paper, five factors are analyzed, i. e. , the block where casing failure occurs, the time when casing failure occurs, the well patters of casing failure, the deformation properties of easing failure, and the downhole operation. Analysis shows that the major causes of the casing failure in the oilfield include the downhole operation including perforation and acid fracturing, the waterflooding and the faults exist in the oilfield. The minor causes include the corrosion, the gas injection, and the quality of steels. Measures for preventing casing failure are also proposed, offering a reference for the control of casing failure in oilfields.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2008年第2期118-121,共4页 Oil Drilling & Production Technology
关键词 温米油田 套管损坏 原因分析 预防措施 Wenmi Oilfieht casing failure cause analysis preventive measure
  • 相关文献

参考文献4

二级参考文献9

  • 1刘合,金岩松.套损井最佳修井时机和修井策略研究[J].石油钻采工艺,2004,26(5):57-59. 被引量:13
  • 2黄满良,刘世强,张晓辉,张研,郭群,胡金铜.套损套变井机械整形工艺[J].石油钻采工艺,2005,27(B06):74-76. 被引量:11
  • 3[1]胡博中.油水井大修工艺技术.北京:石油工业出版社,1998:169~179
  • 4MICHAEL S BRUNO.Geomechanical analysis and decision analysis for mitigating compaction related casing damage[R].SPE 71 695,Terralog Technologies USA,inc,2001.
  • 5FU Yuhong.Research of casing damage mechanism and prevention measures for thermal production wells of heavy oil[C].World Heavy Oil Conference,2006.
  • 6BRUNO M S.Subcidence-Induced well failure[J].SPE20 058,Drilling Engineering,1992-06:148-152.
  • 7CEMOCKY E P,SCHOLIBO F C.Approach to casing design for service in compacting reservoirs[R].SPE 30522,1995-10:22-25.
  • 8HOLT R M,BRIGNOLI M,FJER E,et al.Core damage effects on compaction behaviour[M].1994.
  • 9刘允芳.水压致裂法三维地应力测量[J].岩石力学与工程学报,1991,10(3):246-256. 被引量:79

共引文献33

同被引文献53

引证文献7

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部