摘要 黄河上游梯级水电站数字地震台网是监测黄河上游各大中型梯级水电站大坝监测系统的重要组成部分,台网一期建成13个地震台。文章对黄河上游梯级水电站数字地震台网一期工程的系统构成、主要功能进行介绍,并总结了台网建设运行的效果。该工程建设质量优良,达到国内同类台网先进水平。 The digital seismic network of Yellow River upper stream cascade hydropower stations is one of important part of supervising large and middle cascade hydropower plant of Yellow River upper stream dam supervision system, the first phase has 13 network. The paper makes an introduction about constitution, main function of the abovementioned system, and summarizes its operating effect, the construction quality obtains advantage level among the same network of nation.
出处 《青海电力》 2008年第1期36-38,61,共4页 Qinghai Electric Power
关键词 梯级水电站 数字地震台网 工程 建设 cascade hydropower station digital seismic network engineering construction