摘要
龙羊峡水力发电厂4F机组KZT-150-40型调速器自1991年投入运行以来,存在许多缺点。文章指出了所存在的缺点,并对KZT-150-40型和WWT150型调速器结构、性能进行对比分析,通过试验指出了WWT-150型调速器的性能及优点。
Since put into operation from 1991, the KZT - 150 - 40 4F speed governor of Longyangxia hydropower plant exists lots of deficiency. The paper indicates the existing deficiency, and makes comparison analysis of structure and function between KZT - 150 - 40 and WWT - 150 speed governor, as well as indicates the function advantage of WWT- 150 speed governor through practical experiment.
出处
《青海电力》
2008年第1期39-42,共4页
Qinghai Electric Power
关键词
水轮机组
调速器
换型改造
hydraulic turbine unit
speed governor
transformation