摘要
分析了目前工程量清单计价中存在的缺陷,针对推行工程量清单计价的积极性和坚定性问题,提出了实践中完善工程量清单计价的方法,指出实践是为了更好地了解和掌握工程量清单计价的计价方式,从而解决清单计价中存在的问题。
The defect of current engineering quantity list value was analyzed, aiming at carrying out enthusiasm and finality of engineering quantity list value, the method of perfecting engineering quantity list value in practice was provided, and pointed out that practice is to understand and master cost method of engineering quantity list value, then to solve the question in engineering quantity list value.
出处
《山西建筑》
2008年第13期274-275,共2页
Shanxi Architecture
关键词
工程量清单计价
工程造价
定额
engineering quantity list value, engineering cost, ration