摘要
本文分析了信停期间的工作量、施工方案编制及与各有关单位的配合协调,并从提高信停前联锁关系试验、电气特性指标测试准确性以及采取提前对室外设备进行过渡施工的技术措施等方面,阐述了缩短信停时间的有效途径,从而达到优化施工组织的目的。
The paper analyzes the work load during signal stopping, construction plan and cooperation and coordination work with related units, and elaborates the efficient ways to shorten signal stopping time from several aspects, such as improving the accuracy of interlocking relation test before signal stopping and electrical characteristics index test, making transitional construction of outdoor equipment in advance, and etc., in order to optimize construction organization.
出处
《铁路通信信号工程技术》
2008年第2期62-64,共3页
Railway Signalling & Communication Engineering
关键词
优化
施工方案
缩短
信停时间
运输效率
Optimization, Construction plan, Shortening, Signal stopping time, and Transportation efficiency