多层次模糊综合风险评价模型在水利工程中的应用 被引量:20

Application of Multi-level Fuzzy Comprehensive Assessment Model of Risk Analysis in Civil Engineering
下载PDF
导出
摘要 结合水利工程项目风险的自身特点,建立了基于多层次模糊综合评判项目的风险评价模型,通过分析工程项目风险因素发生的概率、风险影响后果以及风险的不可控程度等参数,解决了水利工程项目的风险分析评价量化问题,并以实例说明这种模型在工程项目风险分析评价中的可行性。 According to own characteristic of the civil engineering project risk, this paper has established a model of project risk assessment based on the multi-level fuzzy synthesis judgment. It has analyzed the probability of occurrence for risk factor in engineering project, risk effect consequence as well as uncontrollable degree of the risk and so on in civil engineering project. It has solved the quantitative problem of the risk analysis and appraisal in the civil engineering project. By the example it has explained the feasibility of this kind of model in engineering project risk analysis and appraisal.
作者 孙淑侠
出处 《水电能源科学》 2008年第2期88-90,106,共4页 Water Resources and Power
基金 华北水利水电学院青年科研基金资助项目(HSQJ2004002)
关键词 风险 风险评价 层次分析法 模糊评价 risk risk assessment analytic hierarchy process fuzzy assessment
  • 相关文献

参考文献7

二级参考文献14

共引文献53

同被引文献89

引证文献20

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部