锚杆静压桩在工联大厦基础工程中的应用 被引量:2

Application of the Press-in Pile with Anchor Rods in the Foundation Work of Gong-Lian Building
下载PDF
导出
摘要 工联大厦工程位于上海市闹市中心,其工程施工场地非常狭小,桩基础外包线内的面积仅为地上部分平面面积的56%,桩基施工方法受到很多限制。工联大厦基础工程选用了锅杆静压拉,实践证明描杆静压极可以用于一些高层建筑的基础,特别对上海闹市区的城市建设和改造具有一定的参考价值。 The foundation work of Gong-Lian Building, located in the downtown of Shanghai, encoun-tered some difficult conditions that the construction site is very small, the area of the pile-envelope is only about 56% of that of ground floor. The construction period is required as short as possible, and the settlement of the building should be less than a certain value to reduce its harmful effects on the neighbor huildings and the Metro near hy. Because of its characters, the press-in pile with anchor rods was applied in the foundation work of Gong-Lian building to overeome those difficulties mentioned above. This foundation work shows that the press-in pile with anchor rods is suitable for the founda-tions of some tall buildings. This experience is also very useful for the construction and reform works in the downtown district of Shanghai.
出处 《结构工程师》 1997年第1期32-35,共4页 Structural Engineers
关键词 锚杆静压桩 高层建筑 基础工程 城市改造 the press-in pile with anchor rods, foundations of tall building, construction and reform works in downtown district
  • 相关文献

同被引文献7

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部