摘要 研究目的:通过采用综合勘察准确地查明石流坡的分类、分布范围、分布厚度、地质成因、稳定程度等,评价其对铁路工程的影响,为线路安全通过岩堆提出解决方案。研究结论:(1)岩堆的组成成分为岩块、岩屑,粒径很大;岩块之间空隙较大,级配不良,在重力和地下水的作用下缓慢移动,危及铁路安全。(2)石流坡空隙中充填大量的细粒土,并长满灌木和乔木,是比较稳定的。通过综合勘察,查明隧道绕避方案中通过岩堆地区的隧道围岩条件较好,有利于线路通过。(3)经过技术经济比选,隧道绕避方案优于路基方案,最终选择隧道绕避方案。 Research purposes :The rock glacier side's sort, distribution range, distribution thickness, geological cause and stability ere are made clear by making integrated survey and on which the influence on railway construction is evaluated for the purpose of presenting the resolution to the railway crossing talus area. Research conclusions : ( 1 ) The talus compose of blocks and detritus and grain size is highly large. The porosity is very large and the gradation is poor. By gravity and groundwater, it takes on active tide and it is threaten to railway engineering. (2)Rock glacier side is steady that its lacunae is infilled by mass fine particle soil and frutex and arbor grows on it. By integrated survey, we made certain that surrounding rock quality of tunnels through rock pile zone is good and it is favorable to railway. (3) Via selection of technic and economy , the tunnel scheme is better than subgrade scheme and we select tunnel scheme finally.
作者 杨磊 樊耀武
出处 《铁道工程学报》 EI 北大核心 2008年第4期1-3,27,共4页 Journal of Railway Engineering Society
关键词 综合勘察 石流坡 稳定性 线路方案 integrated survey rock glacier side stabilization permanent way scheme
  • 相关文献

参考文献3

共引文献93

同被引文献27

引证文献5

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部