摘要
在顺姜II回500kV输电线路工程中,北京送变电公司应用了插入式角钢预制混凝土基础技术,并完成了基础与铁塔的精确安装,有效解决了由于外部因素造成的误工问题,保障了工程的顺利竣工。插入角钢式预制基础在我国电力线路建设中的应用还是首例。
The inserted angled steel prefabricated concrete foundation technique is used in Shun-Jiang 500 kV double circuit line project by Beijing Electric Power Transmission and Transformation Co. For the first time in China' s power line construction, precise installation of foundation and tower are completed successfully, solving schedule delay by external factors and ensuring successful completion of the project.