摘要
通过对平果铝土矿一、二期工程复垦技术条件的分析,提出采用采矿-洗矿-排泥-复垦一体化工艺,解决矿山生产用地的问题,并对该工艺流程、复垦方式及技术经济指标进行了分析研究。
The mining- washing-slime discharging- reclamation integration process wasproposed to solve the problem of mine production land through analysisof technical conditions of reclamation for phaseⅠ and phase Ⅱ projectof Pingguo bauxite mine, analysis and research of the process flow 、 reclamation mode and technical economic index were made.
出处
《冶金矿山设计与建设》
1997年第5期57-62,共6页
Metal Mine Design & Construction