国外复杂系统成本管理和成本估算发展概况 被引量:5

Development of Cost Management and Cost Estimation for Foreign Complex Systems
下载PDF
导出
摘要 现代科技的飞速发展使复杂军工系统的性能和成本急剧增长,激烈的市场竞争要求我们提高成本管理和控制水平。以NASA为代表的西方先进国家军工行业广泛采用了持续的成本风险管理、成本为独立变量、全寿命周期成本、参数化估算法、挣值管理等成本管理和估算方法,取得了良好的效果。 The rapid development of the modern technology is followed by the dramatic increase in the capability and cost of complex system. Hence, it demands us to enhance our cost management and control to be more competitive. The foreign military and defense industries represented by NASA have widely adopted a series of cost management and cost estimation methodologies as Continuous Cost Risk Management (CCRM), Cost As An Independent Variable(CAIV), Lift Cycle Cost (LCC), Parametric Cost Estimating, and Earned Value Management (EVM), which have been influentially effective.
出处 《导弹与航天运载技术》 北大核心 2008年第2期24-29,共6页 Missiles and Space Vehicles
关键词 成本估算 参数估算法 成本管理 Cost estimation Parametric cost estimating Cost engineering
  • 相关文献

参考文献5

  • 1DEFENSE ACQUISITIONS assessments of selected weapon programs[R]. United States Government Accountability Office, 2007-03.
  • 2Joint industry/government parametric estimating handbook[[R]. DoD Parametric Estimating Reinvention Laboratory, 1999.
  • 32004 NASA cost estimating handbook[R]. NASA Cost Analysis Division, 2004.
  • 4FAA life cycle cost estimating handbook[R]. FAA Investment Cost Analysis Branch,2002-06-03.
  • 5吴艳华.成本文化读本[M].北京:中国宇航出版社,2006:104-110.

同被引文献32

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部