期刊文献+

国际资讯

International Information
下载PDF
导出
摘要 LNG船或将面临过剩 国际能源咨询和经纪公司PVMOilAssociates在一份名为《天然气观察》的报告中称。未来两年内LNG船可能出现供给过剩。得出这一结论是基于目前大量LNG生产项目以及进口码头投产延迟的状况。为此。许多新建LNG船只能在有限的即期市场上招徕生意。报告指出。卡塔尔航运公司的船队扩张策略。是导致全球LNG船队运力大涨、LNG船大型化的重要原因之一。 LNG SHIPS MIGHT CONFRONTING SURPLUS International energy consulting and brokerage firm PVM Oil Associates stated that LNG ships might occur an excess supply within the next two years in a document called “Observation of Natural Gas”. This conclusion was drawn based on the current large nuber of LNG production projects as well as the production delays of imported docks. For this reason, many newly built LNG ships could only drum up its business in limited spot market. The report pointed out that the fleet expansion strategy of Qatar Shipping is one of the important causes ofthe rising global LNG ship capacity, and increased scale of LNG ships.
出处 《广东造船》 2008年第1期12-14,共3页 Guangdong shipbuilding
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部