期刊文献+

黑岱沟露天矿短期计划系统及模型建立 被引量:1

HEIDAIGOU OPEN PIT MINE SHORT-PERIOD PRODUCTION PLAN SYSTEM AND MODEL BUILDING
下载PDF
导出
摘要 介绍了准格尔黑岱沟露天矿短期生产计划编制系统及其模型的建立,提出煤矿床地质模型建立过程中的一种考虑各向异性改进的距离幂次反比估值方法,以及图形编辑、计划区算量方法.其估值方法对沉积形成的倾斜矿床及煤层尖灭点估值是有效的,短期生产计划系统模型具有实用性和先进性. The short-period production plan system for Heidaigou Surface Mine and model building are introduced, in this paper.It's put forward an improved distant power inverse estimating value method considering having different character in every direction in the process of building the coal mine deposit geology model,the graphics edition and the method of calculating volume for plan area. This method is effective to estimate the deposited slanting mine bed and point of thinning out. This short-period production plan system model is practical and advanced.
出处 《煤炭学报》 EI CAS CSCD 北大核心 1997年第6期601-605,共5页 Journal of China Coal Society
关键词 露天矿 短期计划 估值 算量 地质模型 煤矿 surface mine,short-period plan,estimated value, calculated volume, geology model
  • 相关文献

参考文献2

  • 1宋子岭,阜新矿业学院学报,1997年,3期,98页
  • 2团体著者,露天矿手册.7,109页

同被引文献87

引证文献1

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部