期刊文献+

邢台煤矿水文地质模型研究

The Study on the Hydrogeolgical Model of Xingtai Coal Mine
下载PDF
导出
摘要 通过对水文地质条件的分析和处理,建立了邢台煤矿石炭系太原组大青灰岩含水层的水文地质物理模型.在此基础上,建立了大有含水层地下求渗流运动的数值模型.用内点法对模型进行了识别和求参,并对邢台并田-320m水平的疏干量和涌水量进行了预计. By the anlysis and disposal of the hydrogeological conditions,the hydrogeological physical model of the Carbonic system Taiyuan group Da Qing limestone aquifer fo Xingtai coal mine is built up in this paper.On the basis of it,the numerical model of groundwater seepage flow movement of Da Qing aquifer is established.The numerical model has been identified and the parameters have been solved with the inner point method.After getting a suitable model,we use it to predict the drainage amount and mine inflow amount of-320m level of Xingtai mine field.
机构地区 中国矿业大学
出处 《阜新矿业学院学报》 1997年第5期545-549,共5页
关键词 煤矿 水文地质模型 涌水量 矿井涌水 physical model numerical model inner point method drainage amount mine inflow amount
  • 相关文献

参考文献1

二级参考文献4

  • 1Earl R. Barnes. A variation on Karmarkar’s algorithm for solving linear programming problems[J] 1986,Mathematical Programming(2):174~182
  • 2Philip E. Gill,Walter Murray,Michael A. Saunders,J. A. Tomlin,Margaret H. Wright. On projected newton barrier methods for linear programming and an equivalence to Karmarkar’s projective method[J] 1986,Mathematical Programming(2):183~209
  • 3Robert J. Vanderbei,Marc S. Meketon,Barry A. Freedman. A modification of karmarkar’s linear programming algorithm[J] 1986,Algorithmica(1):395~407
  • 4N. Karmarkar. A new polynomial-time algorithm for linear programming[J] 1984,Combinatorica(4):373~395

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部