摘要 成都某商住楼工程底板为大体积混凝土工程。工程施工过程中,采用商品混凝土,其水灰比大,干缩变形大,混凝土浇筑正值当地天气较热的6月,这些增加了控制温度裂缝的难度。在具体施工过程中,通过采取严把材料关,避开日最高气温施工,确定合理的配合比等措施,成功地控制了混凝土裂缝的产生。 Some commercial and residential building of Chengdu is the massive concrete engineering. Commercial concrete with high water-cement ratio and shrinkage deformation is selected during the process of construction. Furthermore, concrete is poured in local hotter weather of June, which can increase the difficulty of controlling temperature cracks. The concrete cracks are successfully prevented from producing by adopting some ,measures including choosing materials strictly, avoiding daily maximum temperature to do construction and determining reasonable mixing ratio.
作者 周舒 曹庆
出处 《施工技术》 CAS 北大核心 2008年第4期104-105,共2页 Construction Technology
关键词 混凝土工程 大体积混凝土 裂缝控制 施工技术 concrete engineering massive concrete cracks control construction technology
  • 相关文献

参考文献1

二级参考文献4

  • 1Gajda J, Controlling Temperature in Mass Concrete, Concrete International, 2002, 1, pp59 - 62.
  • 2ACI Committee 207, "Effects of Restraint, Volume Change, and Reinforcement on Cracking of Mass Concrete (ACI 207.2R- 95)".
  • 3Gajda J,Controlling Temperature in Mass Concrete,Concrete International,2002,1,pp59-62.
  • 4ACI Committee 207,''Effects of Restraint,Volume Change,and Reinforcement on Cracking of Mass Concrete (ACI 207.2R-95)''.

共引文献87

同被引文献100

引证文献23

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部