摘要 文中介绍和分析了青藏线铁路通信昆仑桥隧道中弱场盲区的具体状况,针对该隧道实际情况和青藏铁路组网中GSM-R通信系统采用O2+O1的双基站冗余配置方案,文中设计了光纤直放站+漏缆中继器的冗余配置通信方案,消除该隧道通信中弱场盲区。实际测试结果表明:采用文中设计的思路和方案,隧道内覆盖场强值提高了35dBm,彻底消除了该隧道弱场盲区,满足了设计要求。 This paper describes and analyzes the specific situation of the blind spot and weak-field in the Kunlun Tunnel of the Qinghai-Tibet Railway, In view of the actual situation, and the O2 + O1 dual-redundant configuration in the GSM-R communication system used in the Qinghai-Tibet railway, a communication program is designed with fiber Repeater plus Leakage cable repeater, thus to eliminate the weak-field in the tunnel. The actual test results shows that: with this ideas and the program, the field strength values is increased by 35 dBm in the tunnel, thus eliminating the weak-field and the blind spots in the tunnel, and satisfying the design requirements.
作者 朱静
出处 《通信技术》 2008年第4期7-9,共3页 Communications Technology
关键词 光纤直放站 GSM-R 场强覆盖 隧道弱场盲区 fiber repeater GSM-R Field coverage blind spots and weak-field in the tunnel
  • 相关文献

参考文献5

二级参考文献7

  • 1徐华林.专用网移动通信系统参数的预测[J].邮电设计技术,1996(11):15-18. 被引量:2
  • 2(日)铁道通信协会.最新的国铁通信技术[M].北京:中国铁道出版社,1990..
  • 3钱国锋 徐华林.地下铁道移动通信设计[M].北京:中国铁道出版社,1994..
  • 4孙儒石.GSM数字移动通信工程[M].北京:人民邮电出版社,1996..
  • 5EIRENE System Requirements Specification,V140[S].
  • 6铁路GSM-R数字移动通信系统工程设计暂行规定[S].
  • 7杨秀.地铁专用无线通信系统方案比选[J].都市快轨交通,2004,17(1):60-62. 被引量:15

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部