摘要
三峡右岸一期工程混凝土纵向围堰堰坝段和导流明渠三期RCC围堰基础固结灌浆,在严格的灌浆工艺控制下取得了满意的效果,为三峡工程主体建筑物的基岩灌浆制订合理的施工技术要求,有着重要的意义。
In the zone of longitudinal concrete cofferdam and stage Ⅱ coffer dam section of diversion canal of Sanxia stage Ⅰ project, the consolidation grouting construction quality is satisfactory. The bed rock of Sanxia project will be grouted by use of the sa. me technical standards.