摘要
对金塘大桥的工程概况进行了介绍,对金塘大桥30 m现浇箱梁支架施工方案进行了比选,并进行了支架的设计计算,同时阐述了钢管支架的施工过程,以完善现浇箱梁支架施工工艺,可供同类工程借鉴。
This paper introduced the engineering situation of Jintang Bridge, made the comparison and the selection of the 30 meters cast-in-situ box-girder bracket construction scheme of Jintang Bridge, designed and calculated the brackets, and described the construction process of the steel pipe support, to perfect the technology of the cast-in-situ box-girder bracket construction. It can be provided as reference for the similar projects.
出处
《山西建筑》
2008年第14期343-344,共2页
Shanxi Architecture
关键词
桥
箱梁
支架施工
支架预压
bridge, box girder, support construction, prepressing in brackets