摘要
对我国50年代末期有代表性的边勘测、边设计、边施工的“三边”工程之一——古田溪三级电站运行30多年来,其大坝基础状况及部分扬压力孔发生异常等情况作了分析研究,提出了一些建议,对处理类似的“三边”工程具有实际意义.
This paper analyses and studies the situation of the dam foundation and the abnomal uplift pressure drill holes of Gutianxi Third Step Electricpower Station, which is one of the typical projects surveyed, designed and constructed at the same time in late 1950s. this paper puts forward some suggestions which can be used for similar projects.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
1997年第3期1-6,共6页
Journal of Hohai University(Natural Sciences)