摘要
根据现有资料的粗浅分析表明,“95.6”洪水实测最大洪峰流量明显偏大.通过进一步分析得出较为合理的结果,这对流量整编定线提供依据以及规划设计的应用均有一定的实际意义.
According to the analysis of relevent data, the maximum recorded flood peak dis charge of “1995.6” is upward bias. Through further analysis, we can reach the reasonable result. This can put evidence to the compilation and alignment of discharge and have the fact value for planning and design.
出处
《江西水利科技》
1997年第3期162-170,共9页
Jiangxi Hydraulic Science & Technology
关键词
洪峰流量
流量
洪水
洪量
Flood peak
Discharge
Brief analysis