期刊文献+

左江水利枢纽安装间坝段结构计算

Structural calculation for the dam section with erecting bay in the Zuojiang water resources pivotal project
下载PDF
导出
摘要 利用三维有限元法分析计算了左江水利枢纽安装间坝段的应力。计算表明用材料力学法计算结果误差太大,用板梁体系计算过于复杂,用三维有限元法成果可以大量节省钢筋。 With three dimensional finite element method, the author analysed and calculated the stress of the dam section with erecting bay in the Zuojiang water resources pivotal project. The calculation result indicated that result's error is too big, and computing that by the material mechanical method for girder system is too complex. But using 3-dimensional finite element method's result may save on quantities of reinforcing bars, and some section's stress is opposite to the former.
作者 蒋发正
机构地区 广西大学
出处 《广西水利水电》 1997年第2期39-43,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 水利枢纽 安装间 坝段结构 结构计算 water resources pivotal project, erecting bay, structure, finite element method
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部