期刊文献+

洞头峡围垦工程潮流泥沙数值模拟研究 被引量:6

Numerical Simulation of Tidal Current and Sediment on Reclamation Project in Dongtouxia Channel
下载PDF
导出
摘要 使用TK-2D软件建立了瓯江口海区潮流泥沙数学模型,采用潮流泥沙数学模型模拟计算手段,对洞头峡4种围垦工程方案的可行性进行了初步研究,从潮流泥沙角度对洞头峡围垦工程的可行性进行了分析论证。研究结果表明,洞头峡4种围垦方案都是可行的,从对周围海区环境影响和资源可持续利用角度考虑,以保留现有岛间通道进行围垦为佳。 TK-2D software is used to set up tidal current and sediment mathematical models of the Oujiang estuary. By means of tidal current and sediment numerical simulations, elementary studies are carried out on the feasibility of four reclamation project schemes in Dongtouxia channel, and analyses and demonstration are made on their feasibility from the point of view of tidal current and sediment. The study results show that the four reclamation project schemes in Dongtouxia channel are all feasible, and those which preserve the existing channels and passages between islands are better schemes from the point of view of the influence on the surrounding sea area and sustainable utilization of resources.
出处 《水运工程》 北大核心 2008年第4期13-18,共6页 Port & Waterway Engineering
关键词 瓯江口 围垦工程 潮流 泥沙 数学模型 洞头峡 Oujiang estuary reclamation project tidal current sediment mathematical model Dongtouxia channel
  • 相关文献

参考文献8

二级参考文献23

共引文献153

同被引文献128

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部