带有挡冰桩裙的外海承台的施工 被引量:1

Construction of Open Sea Platform with Ice-retaining Pile Skirt
下载PDF
导出
摘要 在东营港扩建工程中,为确保引桥墩台施工的安全高效,利用预制挡冰桩裙和承台钢模板(侧模和部分底模)组拼成组合套箱,起重船整体安装,搅拌船现场浇筑混凝土,实现了外海桥梁承台一体化施工。 During the Dongying port extension engineering construction, to ensure the safety and efficiency of the bridge platform construction, precast ice-retaining pile skirt and platform steel mode (side mode and part of bottom mode) are used to make the assembled box, crane ship is used to implement integral installation,and concrete mixing ship is used to pour on site, through which, platform integration construction in the open sea bridge construction is realized.
出处 《水运工程》 北大核心 2008年第4期112-116,共5页 Port & Waterway Engineering
关键词 挡冰桩裙 组合套箱 施工水位 承台一体化施工 ice-retaining pile skirt assembled box construction water level platform integration construction
  • 相关文献

参考文献3

  • 1东营市人民政府,胜利石油管理局,山东省重点工程办公室.东营港自然环境资料汇编[R].东营:胜利石油管理局,1994.
  • 2JTJ 283-99,港口工程钢结构设计规范[S].
  • 3江正荣.简明施工设计手册(第二版)[M].北京:中国建筑工业出版社.1989.

共引文献10

同被引文献20

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部