摘要 依据实测静载荷试验资料,对杭州地区饱和软黏土层打入式预制桩的休止时间对单桩极限承载力的影响进行了分析,对预制桩静载荷试验的间歇时间进行了探讨。实测资料表明,在特定的地质条件下,打入式预制桩沉桩4个星期后单桩极限承载力仍会有较大幅度的增长。 An analysis was made of the impact of repose time of prefabricated pile hammered into the saturated soft clay in Hangzhou area on the bearing capacity of the pile, based on dead load test data. Studies were also conducted on the intervals of the dead load test. Measured data shows that four weeks after the piles were hammered into the soil, the bearing capacity of single pile still increases substantially under some geographical conditions.
作者 唐晓峰
出处 《铁道建筑技术》 2008年第2期53-55,共3页 Railway Construction Technology
关键词 饱和软土 时效性 单桩承载力 打入式预制桩 saturated soft soil time effectiveness bearing capacity of single pile hammered prefabricated pile
  • 相关文献

参考文献3

二级参考文献5

  • 1孙更生,软粘土堪与地下工程,1984年
  • 2郑大同,地基极限承载力的计算,1979年
  • 3团体著者,1978年
  • 4胡中雄,1987年
  • 5胡中雄,岩土工程学报,1985年,7卷,3期,58页

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部