期刊文献+

国道G304线图布信至霍林郭勒段改建工程环境影响分析及环保对策

Analysis on environment impact and countermeasures for reconstruction project from Tubxin to Hulongol Section in the National Trunk Highway N.304
下载PDF
导出
摘要 针对内蒙古科尔沁草原地区独特的中低山生态系统,结合国道G304线图布信至霍林郭勒段公路改建工程建设项目,分析了该项目对环境的影响,探讨了如何在公路规划、设计、施工和建成后运营阶段全方位做好环保工作。 In the view of unique ecological system in the lower mountains in the Horqin Grassland in Inner Mongolia, this paper analyzes the environment impact from the reconstruction project from Tubxin to Hulongol Section in the National Trunk Highway No. 304, and discusses how to do a work in environmental protection in all phases including the highway planning, the design, the construction and the operation after built.
出处 《内蒙古公路与运输》 2008年第2期51-53,共3页 Highways & Transportation in Inner Mongolia
关键词 公路改建 环境影响 环境保护 对策 措施 reconstruction of highway environment impact environmental protection countermeasure measures
  • 相关文献

参考文献3

  • 1JTJ/T006-98.公路环境保护设计规范[S].[S].,..
  • 2JTG B03 2006,公路建设项目环境影响评价规范[S].
  • 3林伟.鄂西北山区高速公路环境影响要素特点与工程实施对策.湖北公路交通科技,2003,(1).

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部