4Navon R. Process and quality control with a video camera, for a floor-tilling robot. Automation in Construction, 2000, 10(1) : 113-125.
5Choia H S, Han C S, Lee K Y, et al. Development of hybrid robot for construction works with pneumatic actuator. Automation in Construction, 2005, 14(4) : 452-459.
6Gonzalezde Santos P, Estremera J, Garcia E, et al. Power assist devices for installing piaster panels in construction. Automation in Construction, 2008, 17(4) : 459-466.
7Hirofumi O, Koki S, Shigeyasu K. Experimental study of collaborator in human-machine system. Mechatronics, 2009,(19) : 450 - 456.