虚拟企业协同项目进度控制 被引量:1

Project Control for Virtual Enterprise Collaborative Manufacturing
下载PDF
导出
摘要 研究了虚拟企业环境下协同制造项目进度控制的问题。通过分析在虚拟企业环境下项目进度控制的不确定因素,建立了两类不确定性工期-费用离散概率数学模型,提出了赶工估测的计算方法,在此基础上,确定了以赶工方案的工期-费用可协商性为综合性能指标的再协商机制,并结合示例解释其计算过程。最后针对模具生产的特点,对协同制造的模具项目进度进行仿真监控,说明了这一方法的有效性和可靠性。 The project schedule control problem for virtual enterprise was investigated. And analyzing the uncertain factors of the project control in virtual enterprise, two kinds of stochastic models were first put forward, which can describe the uncertainties of the durations and the costs of the activities in the project. Based upon these models,the method of estimating crash project was brought out. And the negotiation mechanism which synthesizes duration's safety and costs validity in the project rescheduling procedure was presented. Next,the implementation of such an mechanism was explained with a simple example. As for the characteristics of the mould and die manufacturing, the negotiation mechanism was carried out on a manufacturing project of the industry. The simulation result shows that the model was applicable,and the negotiation mechanism is reliable and effective as well.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2008年第8期933-938,共6页 China Mechanical Engineering
基金 国家自然科学基金资助项目(50085001) 广东省自然科学基金资助项目(7301063) 粤港关键领域招标项目(2005A10207002) 仲恺农业技术学院校级项目(G2360242)
关键词 虚拟企业 项目控制 工期-费用 协商 virtual enterprise project control time-- cost negotiation
  • 相关文献

参考文献8

二级参考文献26

  • 1李英杰,陈庆新,陈新度,陈新.多属性的虚拟企业并行协商项目规划算法[J].机械工程学报,2005,41(2):215-222. 被引量:17
  • 2李英杰,陈庆新,陈新度,陈新.多属性的虚拟企业串行协商项目规划[J].中国机械工程,2005,16(7):598-603. 被引量:11
  • 3李英杰,陈庆新,陈新度,陈新.多属性虚拟企业部分并行协商项目规划[J].计算机集成制造系统,2005,11(6):810-817. 被引量:18
  • 4Fleszar K, Hindi K S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search. European Journal of Operational Research, 2004,155(2): 402~413.
  • 5Peter B, Andreas D, Rolf M, et al. Resource-constrained project scheduling: Notation, classification, model, and methods. European Journal of Operational Research, 1999,112: 3~41.
  • 6Susan E C, Kazuhiro K, Victor R, et al. Multistage negotiation for distributed constraint satisfaction. IEEE transactions on system, man, and cybernetics, 1991, 21(6): 1 462~1 477.
  • 7Leu S S, Chen A T, Yang C H. A GA-based fuzzy optimal model for construction time-cost trade-off. International Journal of Project Management, 2001, 19:47~58.
  • 8Timonthy L, Shaftel, Beverley M W. Time-cost evaluation of alternative system/process designs. International Transactions in Operational Research, 1999, 6:275~288.
  • 9WANG Dingwei, YUNG K L, IP W H.A Heuristic Genetic Algorithm for Subcontractor Selection in a Global Manufaturing Environment.IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews, 2001,31(2):189~198
  • 10Conry S E, Kuwabara K, Lesser V R, et al. Multistage Negotiation for Distributed Constaint Satisfaction. IEEE Transactions on System, Man, and Cybernetics,1991,21(6): 1462~1477.

共引文献31

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部