机会约束规划下的梯级水电站短期优化调度策略 被引量:30

A New Strategy for Short-term Scheduling Optimization of Cascade Hydro Plants Based on Chance-constrained Programming
下载PDF
导出
摘要 以一定时期内可能实现的总的目标利润最大化为目标,在一定的置信水平的前提下满足约束条件,基于机会约束规划构建了一种新的的梯级水电站短期优化调度策略。模型全面分析了蓄水量、弃水量、前池水位、放水路水位、发电水头之间的关系,并考虑了电价、入库径流量、机组运行状况等不确定因素对梯级水电站短期优化调度问题的影响。利用粒子群算法算简单、鲁棒性好、可操作性强的优势,将其嵌入蒙特卡罗随机模拟对模型进行求解。算例说明了该方法可以根据电站的实际情况协调风险和利润这两个相互矛盾的指标,实现最优化决策。 To maximize the possible total objective profit throughout a time period, a novel strategy for short-term scheduling optimization of cascade hydro plants is presented based on chance-constrained programming in which the constraints are met with a specified probability. The detailed representation of cascade hydro plants, which includes water volume, water inflow, water discharge, forebay elevation, tailrace elevation and effective water head, is studied in the proposed strategy. The uncertainties, such as water inflows, electricity prices and unit status are taken into account as well. The model presented is solved using a combination of particle swarm optimization (PSO) and Monte Carlo simulation because of the advantages of PSO such as simple concept, easy implementation and robustness. The results show that the two conflicting targets of profit and risk can be coordinated preferably according to the practical system, and the optimization of power output for cascade hydro plants is established by the developed method.
出处 《中国电机工程学报》 EI CSCD 北大核心 2008年第13期41-46,共6页 Proceedings of the CSEE
基金 国家自然科学基金项目(50767001) 国家863高技术基金项目(2007AA04Z100) 广西自然科学基金资助项目(桂科自0640028) 广西壮族自治区研究生教育创新计划项目(20060808M32) 广西高校百名中青年学科带头人资助计划项目(RC20060808002) 广西壮族自治区教育厅资助项目(桂教科研[2005]47号)~~
关键词 梯级水电站 短期优化调度 不确定性 机会约束规划 蒙特卡罗仿真 粒子群算法 cascade hydro plants short-term optimizationscheduling uncertainty chance-constrained programming monte carlo simulation particle swarm optimization
  • 相关文献

参考文献21

  • 1曾勇红,姜铁兵,张勇传.三峡梯级水电站蓄能最大长期优化调度模型及分解算法[J].电网技术,2004,28(10):5-8. 被引量:36
  • 2Cabero J, Baillo A, Cerisola S, et al. A medium-term integrated risk management model for a hydrothermal generation company[J]. IEEE TransonPowerSystems, 2005, 20(3): 1379-1388.
  • 3Amjady N, Farrokhzad D, Modarres M. Optimal reliable operation of hydrothermal power systems with random unit outages[J]. IEEE Transactions on Power Systems, 2003, 18(1): 279-287.
  • 4Gonzalez C, Juan J, Mira J, et al. Reliability analysis for systems with large hydro resources in a deregulated electric power market[J]. IEEE Transactions on Power Systems, 2005, 20(1): 90-95.
  • 5蔡兴国,林士颖,马平.现货交易中梯级水电站竞价上网的研究[J].中国电机工程学报,2003,23(8):56-59. 被引量:29
  • 6蔡兴国,林士颖,马平,孙富华,刘振平.电力市场中梯级水电站优化运行的研究[J].电网技术,2003,27(9):6-9. 被引量:23
  • 7左幸,马光文,过夏明.三角旋回算法求解梯级电站群短期优化调度[J].电力系统自动化,2006,30(13):28-32. 被引量:9
  • 8Arce A, Ohishi T, Soares S. Optimal dispatch of generating units of itaipti hydroelectric plant[J]. IEEE Transactions on Power Systems, 2002, 17(2): 154-158.
  • 9Borghetti A, FrangioniA, LacalandraF, et al. Lagrangian heuristics based on disaggregated bundle methods for hydrothermal unit commitment[J]. IEEE Transactions on Power Systems, 2003, 18(1) : 313 - 322.
  • 10Fuentes-Loyola R, Quintana v H. Medium - term hydrothermal coordination by semidefinite programming[J]. IEEE Transactions on Power Systems, 2003, 18(4): 1515-1522.

二级参考文献84

共引文献258

同被引文献407

引证文献30

二级引证文献296

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部