摘要
介绍了沙角A电厂新增入厂煤、入炉煤自动采样装置改造工程的实施情况、系统的工艺流程和控制方式,指出了入厂煤、入炉煤自动采样装置在改造过程中所遇到的问题与解决方法以及改造后所取得的成果。
The transformation in Shajiao A Power Station to add automatic sampling equipment of coal as received and as fired is introduced in this paper. Moreover. the technical flow and control mode of the system are described. The problems in the transformation and the solution thereof are indicated along with the satisfying results of this project.
出处
《广东电力》
2008年第4期66-68,共3页
Guangdong Electric Power
关键词
一体化煤采样装置
入厂煤
入炉煤
人工采样
调试
integrated coal sampling equipment
coal as received
coal as fired
manual sampling
commissioning