摘要
对吊车梁的制作特点进行了分析,阐述了吊车梁制作流程,详细介绍了选料、下料、放样、起拱、校正、单件组装、高强螺栓摩擦面处理、焊接和无损检测等流程,以供参考借鉴。
It analyses the manufacture characters of crane beam, represents the manufacture progress of crane beam, and introduces the material selection, baiting, lofting, rising of arch, correcting, single part component, the management of high strengthening bolt, welding, and noware detection, to supply reference.
出处
《山西建筑》
2008年第10期343-344,共2页
Shanxi Architecture
关键词
吊车梁
水平支撑
腹板
高强螺栓
crane beam, horizontal supporting, web, high strengthening bolt