摘要
介绍了工程量清单招标的基本方法,阐述了施工单位在招标阶段和施工阶段的工作内容,分析了工程量清单制度下施工单位造价控制中存在的问题,以帮助施工企业更好地控制工程造价,提升企业的经济效益和竞争力。
It introduces the basic ways of detailed list tender, illustrates the working content of construction part on tender stage and construction stage, analyses problems existing in the cost control of construction part under detailed list institution, so as to help construction enterprises realize better control of project cost and improve the benefit and competitiveness of enterprises.
出处
《山西建筑》
2008年第15期249-250,共2页
Shanxi Architecture