摘要
以北京首都国际机场扩建楼前交通工程高架桥为例,简要介绍了钢板箍墩柱施工的特点,并从承台预埋锚栓定位、预留锚栓孔处置、加工钢板箍、包装运输、钢筋笼制作与安装、吊装钢板箍六个方面详细介绍了钢板箍墩柱施工技术,为类似工程提供参考借鉴。
Setting the traffic project of fly over crossing in the front of the rebuilding building of Beijing national aerodrome as example, it simply introduces the characters of steel plate hoop piei construction and the construction technique of it from the location of cushion cap pre-bury- ing anchor, the management of preformed anchor hole, processed steel plate hoop, packing and transporting, the manufacture and setting of steel reinforced cage and sling steel plate hoop, to supply reference to similar projects.
出处
《山西建筑》
2008年第15期323-324,共2页
Shanxi Architecture
关键词
钢板箍
墩柱
施工技术
steel plate hoop, pier, construction technique