期刊文献+

温州石化基地围垦工程潮流泥沙数值模拟研究 被引量:7

Numerical Modeling Study of Tidal Flow and Sediment for Reclamation Project for Wenzhou Petrochemical Industrial Base
下载PDF
导出
摘要 使用TK-2D软件建立了瓯江口海区潮流泥沙数学模型,通过数值计算分析了温州石化基地围垦工程对瓯江北口、中水道、黄大岙、重山、沙头、小门、黄大峡等水道,以及对瓯江泄洪排涝和附近港区、海域的影响。研究结果表明:围垦工程对附近各港区、水道影响很小,温州石化基地围垦工程建设是可行的。 A mathematical model was set up with the TK-2D software for the tidal flow and sedimentation in the sea area in the Oujiang Estuary. With the mathematical model, simulations and studies were made to analyze the influence of the reclamation project for Wenzhou Petrochemical Industrial Base upon the North Oujiang Estuary, Middle Waterway, Huangda'ao Waterway, Zhongshan Waterway, Shatou Waterway, Xiaomen Waterway and Huangdaxia Waterway; the flood discharge and drainage of stagnant water in the Oujiang Estuary; and the vicinal ports and sea area. The results of the studies show that the reclamation project will impose little impact upon the vicinal ports and waterways and the construction of the reclamation project for Wenzhou Petrochemical Industrial Base is feasible.
出处 《中国港湾建设》 北大核心 2008年第2期31-34,共4页 China Harbour Engineering
关键词 瓯江口 围垦工程 潮流 泥沙 数学模型 石化基地 Oujiang Estuary reclamation project tidal flow sediment, mathematical model petrochemical industrial base
  • 相关文献

参考文献6

二级参考文献13

共引文献138

同被引文献137

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部