摘要 苏通大桥为主跨1 088 m的世界第一跨距双塔双索面斜拉桥。主桥钢箱梁安装过程中,因风、温差等引起钢箱梁较大变形及振动,为此,进行了测量机器人自动监测软件系统的开发,同时采用高采样率GPS,研究开发实时无线数据采集传输系统,克服了斜拉桥传统测量、监测方法的弊端,该研究系统在钢箱梁安装局部测量与全局测量中取得了较理想的效果及应用价值,确保了苏通大桥主桥钢箱梁线形几何控制准确,合龙精度为轴线0.5 mm、高程1.5 mm。 Sutong Bridge is a twin-tower and twin-cable cable stayed bridge with its main span of 1 088 m long which is the longest span in the world.During the installation of the box girder for the main section,the steel box girder developed greater deformation and vibration because of winds and temperature variation.Therefore,a software system for automatic monitoring by a robot surveyor was developed and,in the meantime,a real-time wireless data acquisition and transmission system was also developed by adopting the GPS with high sampling rate,thus overcoming the malpractice in traditional methods for survey and monitoring of cable stayed bridges.The newly developed survey system has achieved ideal results and value of application in local and overall survey of the installation of the box girders and has ensured the accuracy of the linear and geometric control of the steel box girders for the main section of Sutong Bridge.The closure tolerance was axially 0.5 mm and 1.5 mm in elevation.
作者 张鸿 刘金平
出处 《中国港湾建设》 北大核心 2008年第2期44-51,共8页 China Harbour Engineering
关键词 苏通大桥 钢箱梁 安装 几何测量 监测 Sutong Bridge steel box girder installation, geometric survey monitoring
  • 相关文献

参考文献1

二级参考文献3

  • 1章书寿 华锡生.工程测量[M].北京:水利水电出版社,1998.47-50.
  • 2章书寿,工程测量,1998年,47页
  • 3刘大杰,全球定位系统(GPS)的原理与数据处理,1996年,83页

共引文献8

同被引文献11

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部